Passive network services

From the first core drill to the last label on the patch panel. Each service has its own specification and questions.

How every project runs

01

Site visit and survey

Measuring pathways, reviewing the rack location, existing power and earthing.

1–3 days
02

Design and BOQ

Route drawings, rack layout and an itemised bill of materials with named brands.

3–7 days
03

Installation

Pathways, cable pulling, termination and rack assembly by a fixed crew.

Scale-dependent
04

Testing and certification

Every port tested individually; any link without adequate margin is corrected.

1–4 days
05

Handover and warranty

As-built drawings, the full test report, and the start of the system warranty.

10-year cover

Get an initial estimate

A port count and an approximate floor area are enough. Site surveys are free, and the first estimate comes the same day.